logotype
CONTACT US
  • Featured

Discover how modern aesthetics meet the highest BMW standards in the most efficient manner.

BMW HELLAS

  • AREA Aspropyrgos, Attica
  • LOCATION Schineza

  • PLOT SURFACE 26.965 sq m
  • WAREHOUSE SURFACE 9.000 sq m
  • OFFICES SURFACE 1.114 sq m
BACK TO LIBRARY

PROJECT OVERVIEW

The training center was developed under the supervision of BMW specialists from Germany, ensuring it adheres to the same world-class standards as the Munich training center.

Equipped with pioneering facilities,including seminar rooms, a restaurant, a workshop, and an office, it provides an ideal environment for professional training. The facility is equipped with fire detection and extinguishing systems, advanced alarm systems, and electronic cameras to ensure optimal safety.

Technical features

Metal construction with 9 hydraulic ramps, sprinklers, fire detection, industrial floor with metal fibers with strength of 7 tonnes/sq m, 15 external cameras, beams externally, external overlay with 8 cm panels.

BACK TO LIBRARY {id=80679782845, createdAt=1695801535498, updatedAt=1703152981849, path='bmw', name='Bmw | Karpathios', 1='{type=string, value=BMW HELLAS}', 2='{type=list, value=[{id=1, name='Featured', order=0, label='Featured'}]}', 3='{type=string, value=Schineza}', 4='{type=string, value=Aspropyrgos, Attica}', 5='{type=string, value=26.965}', 6='{type=string, value=9.000}', 7='{type=string, value=1.114}', 8='{type=string, value=

PROJECT OVERVIEW

The training center was developed under the supervision of BMW specialists from Germany, ensuring it adheres to the same world-class standards as the Munich training center.

Equipped with pioneering facilities,including seminar rooms, a restaurant, a workshop, and an office, it provides an ideal environment for professional training. The facility is equipped with fire detection and extinguishing systems, advanced alarm systems, and electronic cameras to ensure optimal safety.

Technical features

Metal construction with 9 hydraulic ramps, sprinklers, fire detection, industrial floor with metal fibers with strength of 7 tonnes/sq m, 15 external cameras, beams externally, external overlay with 8 cm panels.

}', 9='{type=string, value=

Discover how modern aesthetics meet the highest BMW standards in the most efficient manner.

}', 10='{type=image, value=Image{width=1920,height=1080,url='https://26079927.fs1.hubspotusercontent-eu1.net/hubfs/26079927/bmw-10.jpg',altText='',fileId=null}}', 12='{type=string, value=Logistics | Training Center | Offices}', 13='{type=string, value=The high-end, cutting-edge BMW training center in Greece was designed and built according to the Munich training center standards, in collaboration with the BMW experts.}', 14='{type=list, value=[{id=87916168126, name='BMW-7'}, {id=87927026904, name='BMW-8'}, {id=88668566489, name='BMW-9'}]}'}